Revitalizing an Aging Elementary School’s Plumbing Infrastructure

An aging elementary school facing recurring plumbing issues underwent a remarkable transformation. Partnering with a NuFlow Certified Contractor, they embraced innovative trenchless pipe lining techniques to revitalize over 700 feet of cast iron pipes and a significant reduction in maintenance calls.

Built in the 1970s, an elementary school in Frankston, Texas, found itself grappling with persistent plumbing issues stemming from its aging infrastructure. Despite recognizing the need for regular maintenance, the school had hesitated due to the potential cost, destruction, and inconvenience associated with a complete pipe overhaul.

The school’s maintenance staff had been relying on a local plumbing company for periodic maintenance and drain cleaning, a service requested an average of two times per month. It was during this ongoing collaboration that the plumbing company became a NuFlow Certified Contractor. Eager to explore innovative solutions, they initiated a conversation with the school’s head of maintenance about the benefits of trenchless pipe lining.

The contractor conducted a comprehensive camera inspection to evaluate the extent of the damage within the existing cast iron pipes. The inspection revealed widespread issues, including channel rot, multiple cracks, decay, and corrosion. Armed with these findings, they presented a detailed project proposal to the school’s board of directors, which was swiftly approved.

The project kicked off with the application of NuDrain cured-in-place-pipe (CIPP) lining to restore both the main line and lateral connections of the plumbing system. To maximize efficiency and accelerate the production timeline, the NuFlow contractor made a strategic investment in a NuCure Cold Cure UV lining system. The introduction of this UV system significantly reduced curing times, enabling them to line a greater length of pipes daily. This newfound momentum propelled the project to completion a few days ahead of schedule.

Upon completion, the dedicated team had successfully rehabilitated over 700 feet of 3-inch, 4-inch, and 6-inch cast iron pipes within the school’s infrastructure. They managed to finish the project well in advance of the return of students and staff for the new academic year. Remarkably, since the project’s conclusion, there have been no reported instances of drain clogs, a testament to the effectiveness of the trenchless pipe lining solution implemented.

Destiney Strickland-Johnson

Share
Published by
Destiney Strickland-Johnson

Recent Posts

Why Is My Heat Pump So Noisy?

It's normal for heat pumps to make certain sounds as they operate. For instance, you…

3 months ago

SOS: My Thermostat Isn’t Reaching the Right Temp

Maintaining a comfortable indoor temperature is essential, especially given the region's varying climate. Strickland Plumbing…

3 months ago

Why Is My Heater Blowing Cold Air?

When temperatures drop, the last thing you want is for your heater to start blowing…

3 months ago

8 Tips for Reducing Your Summer Electric Bill

Summer is approaching, which means it's time to start planning how you'll keep cool during the hot Texas temperatures without…

7 months ago

3 Signs It’s Time to Get a New AC

There you are, just living life, and flipping on your AC every year when it…

7 months ago

How UV Lights Improve Indoor Air Quality

UV lights have been used to grow plants, make people's moods better, and even kill…

7 months ago